The system is buildable. The core protocol logic is deterministic and low-risk. The two genuine risks are: (1) on-metal RFID tag compatibility per instrument — resolved by a bench test before deployment; (2) unconfirmed regulatory obligation — resolved by asking the lab's quality manager one question.
The longest pole is not code. It is physically tagging every instrument in the lab and maintaining that registry over time.